2017
(México / transportation)
Grupo México Transportes starts trading on the Mexican Stock Exchange.
Florida East Coast Railway acquired.
2016
(México / Mining)
Start of operations at the Buenavista del Cobre Concentrator Plant II, with the largest capacity in México.
2015
(México / Infrastructure)
Salamanca-Leon highway opens.
(Spain / Mining)
Grupo México is granted the international tender for the exploration and exploitation of the Aznalcollar Mine.
2014
(México / Infrastructure)
Operations at El Retiro wind farm in Oaxaca are launched.
(México / Mining)
Operations at the Buenavista del Cobre SX/EW Plant III (electrolytic extracted copper cathode plant),begin. This plant operates the largest volume of solutions in the world.
2013
(México / Infrastructure)
Start of operations at La Caridad combined cycle power plants.
(México / Mining)
Start of operations at the new Buenavista del Cobre Molybdenum Plant.
2012
(México / Infrastructure)
Grijalva Tunnels open.
2011
(México / Infrastructure)
Grupo México acquires outright control of Consutec and creates Grupo México Servicios de Ingeniería.
Grupo México is granted the highway concession to build and operate the high-specification A4S Salamanca-Leon highway in Guanajuato.